opyeb RefiCal

Guides · Prepayment fee

The 2025 prepayment-fee reform: three years, actual cost only

Basis 2026.11.27 · Prepayment fee · about 9 min

A prepayment fee is charged for repaying before maturity. The Financial Consumer Protection Act bans it in principle and allows it only for repayment within three years of drawdown. For years lenders set it without a published method; in July 2024 the supervisory rule was amended to allow only actual cost, and from 13 January 2025 it applies to new contracts. As of November 2026 that structure is unchanged.

What counts as actual cost

Two families of cost are allowed: the funding opportunity cost of early repayment (interest lost while the money is redeployed, the rate gap on refinancing) and unrecovered administrative and origination costs (stamp duty, valuation, registration, lease investigation, broker fees). Adding anything else is an unfair business practice. Lenders recalculate the cost annually and publish the rate through their associations.

The rates after the reform

The FSC reported bank fixed-rate secured loans falling from 1.43% to 0.56% and variable credit from 0.83% to 0.11%. The five largest banks' variable secured loans sit at 0.58–0.74%. Savings banks remain higher: 1.20% secured and 1.33% credit. A September 2025 adjustment trimmed 0.01–0.02 points from guarantee and other loans, without retroactive effect.

SegmentBeforeAfter (disclosed)
Bank secured, fixed1.43%0.56%
Bank secured, variable (big five)about 1%0.58–0.74%
Bank credit0.83%0.11%
Savings bank secured1.64%1.20–1.24%
Savings bank credit1.64%1.33%

These are the 2025 disclosures. They are renewed each year and apply to contracts signed by 31 December of that year, so for a 2026 contract check the latest publication. Credit unions, community banks and agricultural cooperatives fall outside the Act and may differ.

The formula — falling with the three-year clock

Amount × rate × (3 years − elapsed) ÷ 3 years. Repaying KRW 300m at 0.56% after 18 months costs 300m × 0.0056 × 18 ÷ 36 = KRW 840,000. After six months it is KRW 1.40m; after thirty months, KRW 280,000; after three years, nothing. Each extra month saves about KRW 46,667.

ElapsedLeft of three yearsFee on KRW 300m at 0.56%
6 months30 monthsKRW 1,400,000
1 year24 monthsKRW 1,120,000
18 months18 monthsKRW 840,000
30 months6 monthsKRW 280,000
3 years or more00

Feeding it into the decision

The fee is usually the largest item of the switch. On KRW 300m after 18 months it is KRW 840,000, more than the KRW 610,000 of other costs. It lengthens the break-even, so waiting for the three-year mark can help — but count the interest you pay while waiting. Six months at a one-point gap on KRW 300m costs KRW 1.5m of extra interest to save KRW 280,000 of fee, which is no bargain.

Questions

When does the fee become zero?

On repayment three years after drawdown. Contracts signed on or after 13 January 2025 cannot be charged after that; earlier contracts follow their own agreement, so check it.

Is a partial repayment charged?

Yes, on the amount repaid early. Repaying KRW 100m of a KRW 300m loan is calculated on KRW 100m, subject to any minimum or exemption in the agreement.

Should I wait three years to avoid the fee?

Compare the fee saved with the interest paid while waiting. At a one-point gap on KRW 300m, six months costs KRW 1.5m of interest to save KRW 280,000 of fee — not worth waiting.

Enter the amount, rate and elapsed time to see the fee payable today.

Open the calculator

Basis date 2026.11.27. Written against primary guidance and statute; updated when the rules change.

Back to the guides